World Trade Factory™

An Inconvenient Reality: Climate-Preparedness Cuts Are Lethality Cuts

In 2019, the Missouri River flooded at historically high levels and damaged 137 facilities, destroyed 1.2 million square feet of workspace, and flooded 3,000 feet of runway at Offutt Air Force Base. Repairing the installation cost $1.2 billion. The Trump administration and Department of Defense just

An Inconvenient Reality: Climate-Preparedness Cuts Are Lethality Cuts

In 2019, the Missouri River flooded at historically high levels and damaged 137 facilities, destroyed 1.2 million square feet of workspace, and flooded 3,000 feet of runway at Offutt Air Force Base. Repairing the installation cost $1.2 billion. The Trump administration and Department of Defense justified $1.2 billion in budget reductions to the U.S. Geological Survey, National Oceanic and Atmosphe

Science War on the Rocks May 26, 2026

Read Full Article →

📱 Tip: Tap the 🔗 Share icon in Safari and choose Add to Home Screen to install World Trade Factory.